Bidding

Raw coal (Puyang coal, Luliang coal)

Time: 587

I. Quality requirements and conditions for quality responsibility

The system of deduction for excessive product quality shall be implemented. If the quality of the products provided by the supplier exceeds the requirements of the target, the supplier shall deduct the unit price for settlement. The specific method is as follows:

1. Puyang coal

(1) When 4000 kcal ≤ application base low calorific value <4200 kcal, purchase at a discount, settlement price of this batch of products = contract unit price + 4200X measured calorific value X0.97; When 3800 kcal ≤ low calorific value of application base < 4000 kcal, the party shall have the right to refuse to receive the goods in storage and return or replace the goods. The seller shall bear all the costs of return and replacement. If the buyer agrees to accept the goods, the settlement price shall be based on the contract unit price of 64200x measured calorific value X0.87.

(2) When 22% is less than the total moisture of the base received but less than 24%, the purchase price shall be reduced. The price reduction calculation method is: the total moisture of the base received is in the quality standard, and the price reduction amount = the contract unit price X (total moisture detected value - total moisture standard value). When the total moisture content of incoming coal is greater than 2, the buyer has the right to refuse to receive the coal and return or replace the coal. If the coal has been stored, the price reduction will be implemented. The price reduction amount = contract price X (total moisture detected value - total moisture standard value) X2.

(3) Upon receipt of base total sulfur >0.9%, the goods shall be returned or replaced in principle. If the goods have been discharged, the price reduction shall be implemented. The reduction calculation method is as follows: a deduction of 3 yuan/ton will be made for every 0.1% of dry base total sulfur exceeding the standard (if the excess is less than 0.1%, it is still counted as 0.1%). If it has been put into storage, the price reduction shall be implemented. The calculation method of the price reduction of 1. 1% is: for each 0.1% of dry base total sulfur exceeding the standard (if the excess is less than 0.1%, it is still counted as 0.1), a deduction of 6 yuan/ton will be made.

(4) When 28%≤ volatile content <30%, this batch of products shall be deducted at 5 yuan/ton.

(5) When 28%≤ fixed carbon <30%, this batch of products shall be deducted at 5 yuan/ton.

(6) When the ash content is greater than 10%, this batch of products shall be deducted at 5 yuan/ton.

2. Luliang coal

(1) When 3600 kcal ≤ application base low calorific value <3800 kcal, purchase at a discount, settlement price of this batch of products = contract unit price + 3800X measured calorific value X0.97; When the low calorific value of the application base is less than 3600 kcal, the buyer refuses to connect to the warehouse. If the buyer agrees to accept, the settlement price = contract price + 3800X measured calorific value X0.87 will be settled.

(2) When 28%< total moisture ≤30%, the purchase price shall be reduced. The price reduction calculation method is: for every amount of total moisture received, the price reduction amount = the contract unit price X (total moisture detected value - total moisture standard value). When the total moisture content of incoming coal is more than 30%, the buyer has the right to refuse to receive the coal and return or replace the coal. If the coal has been stored, the price reduction will be carried out. The price reduction amount = the contract unit price (total moisture detected value - total moisture standard value) X2.

(3) Upon receipt of base total sulfur >0.5%, the goods shall be returned or replaced in principle. If the goods have been discharged, the price reduction shall be implemented. The reduction method is as follows: a deduction of 3 yuan/ton will be made for each 0.1% of dry base total sulfur exceeding the standard (if the excess is less than 0.1%, it shall still be counted as 0.1%). If it has been put into storage, the price reduction shall be implemented. The calculation method of the price reduction of 0.7% is: for every 0.1% of dry base total sulfur exceeding the standard (if the excess is less than 0.1%, it is still calculated as 0.1), a deduction of 6 yuan/ton will be made.

(4) When 28%≤ volatile content <30%, this batch of products shall be deducted at 5 yuan/ton.

(5) When 28%≤ fixed carbon <30%, this batch of products shall be deducted at 5 yuan/ton.

(6) When the ash content is > 12%, this batch of products shall be deducted at 5 yuan/ton.

Ii. Quotation and payment settlement

1. The tender offer is valid from October 26, 2021 to November 30, 2021, and the price shall not be adjusted or changed during the validity period. The bidder shall fully consider the market risk.

2. From October 26, 2021 to November 30, 2021, the goods shall be delivered according to the delivery notice issued by the Buyer. The Supplier shall be responsible for delivering the goods to the yard of the Company's factory and discharging the goods.

3. Settlement method of this bidding and procurement: The buyer shall make settlement according to the quantity and quality delivered by the supplier, and the supplier shall issue a special VAT invoice to the buyer according to the settled amount (13% VAT special invoice with tax included), and the buyer shall pay the payment to the supplier within 30 days upon receipt of the invoice.

Iii. Bid opening and evaluation

1. Bid opening date: November 1, 2021.

2. Bid evaluation method: The bid inviter shall discuss the bid internally within 2 days after the bid deadline.

3. Notice of Winning the bid: Within the validity period of the bid, the tenderee shall notify the winning bidder in written form (Notice of winning the bid). The notification is an integral part of the contract.

Iv. Signing of contracts and agreements

1. The winning bidder shall sign the contract agreement at the time and place designated by the tenderer after receiving the notice of winning the bid from the Tenderer.

2. If the successful bidder fails to sign the contract agreement as required, the tenderer will be disqualified from winning the bid. Under such circumstances, the tenderer has the right to select the second winning bidder or alternate winning bidder in order.

Download relevant bidding documents

  • 0B

Contact Information

  zhgrhl@126.com

  0756-6332383

  http://zhgrhl.com/

  3016, No. 33, Jinmeng Lane, Xiangzhou District, Zhuhai


Copyright © 2022 zhuhai guangrui huili development co.,ltd  All Rights Reserved.    粤ICP备2023035093号    Powered by : www.300.cn  SEO